In this paper, the failure of the bolts that fasten the draft tube of a 95-MW Francis turbine is presented. The fracture of the bolts is especially frequent when the machine operates at partial load. Fracture surface analysis and stress measurements under several power levels were done. Stress was also measured, while pressure relief in the spiral case was performed. Finally, stress measurements were conducted while pressured air was injected at the stay vanes and the machine was operating at partial load. With the strain measured; stress on the bolts was calculated. The fracture surface analysis showed that fatigue is the failure mechanism. Stress measurements revealed that strong vibration and broad stress variation is present when the machine operates at powers below 80 MW. Air injection effectively decreases vibration and stress fluctuation, but pressure relief in the spiral case did not show any beneficial effect.
机译:在本文中,介绍了固定95兆瓦弗朗西斯涡轮机引流管的螺栓的故障。当机器在部分负载下运行时,螺栓的断裂特别频繁。在几个功率水平下进行了断裂表面分析和应力测量。在螺旋壳体中进行压力释放的同时,还测量了应力。最后,在将压力空气注入斜拉叶片并且机器在部分负载下运行的同时进行应力测量。测量应变计算螺栓上的应力。断裂表面分析表明,疲劳是破坏的机理。应力测量表明,当机器以低于80 MW的功率运行时,会出现强烈的振动和较大的应力变化。空气注入有效地减小了振动和应力波动,但是在螺旋形壳体中的压力释放没有显示出任何有益的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号