Hot Dip Galvanizing Line for Latest High-Strength Steels Commissioned at voestalpine Stahl

机译:奥钢联钢铁股份公司委托的最新高强度钢热镀锌生产线

获取原文
获取原文并翻译 | 示例
           

摘要

Suppliers to the automotive industry have been facing constantly increasing demands in terms of production quality, quantities and costs. As a consequence production lines have to deliver superior quality, less scrap and higher production rates, while consumption of resources has to be minimized. To meet these market demands, voestalpine Stahl GmbH, the leading Austrian steel producer, decided to invest in a new hot dip galvanizing line, No. 4 in Linz, Austria. The new line is rated to produce 450,000 t/a of cold rolled steel strip in widths from 750-1,750 mm and thicknesses from 0.4 to 2.0 mm. Moreover, it is equipped with the latest furnace technology, a zinc bath, a skin pass mill, a tension leveller and a coater. The main technical parameters of the line are summarized in table 1. The range of materials to be processed on the new plant covers various new steel grades, e.g. extra-deep drawing quality (EDDQ) steel, high-strength low alloyed steel (HSLA), CP steel, and TRIP steel. The line has been laid out to produce zinc coatings in the range from 60 to 350 g/m~2. The project was started in early June 2005. The general planning of the whole line was done by Andritz construction engineers. Beyond engineering, manufacturing, supply and commissioning, the contract included operator training and start-up technology. Assembly of the plant components began in May 2006. The new HDGL No. 4 started operation on April 16, 2007.
机译:汽车行业的供应商在生产质量,数量和成本方面一直面临着不断增长的需求。结果,生产线必须提供卓越的质量,更少的废品和更高的生产率,同时必须将资源消耗降至最低。为了满足这些市场需求,奥地利领先的钢铁生产商voestalpine Stahl GmbH决定投资在奥地利林茨新建的热镀锌生产线4号。新生产线的生产能力为年产450,000吨冷轧钢带,宽度从750-1,750毫米,厚度从0.4到2.0毫米。此外,它还配备了最新的熔炉技术,锌浴,光整机,张力矫直机和涂布机。该生产线的主要技术参数汇总在表1中。在新工厂中要处理的材料范围包括各种新钢种,例如超深拉伸质量(EDDQ)钢,高强度低合金钢(HSLA),CP钢和TRIP钢。该生产线已经布置好,可生产范围为60至350 g / m〜2的锌涂层。该项目于2005年6月上旬开始。整个生产线的总体规划由Andritz建筑工程师完成。除工程,制造,供应和调试外,合同还包括操作员培训和启动技术。工厂组件的组装于2006年5月开始。新的HDGL 4号于2007年4月16日开始运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号