KEEPING CONSTRUCTION AND REFURBISHMENT PROJECTS ON SCHEDULE

机译:保留时间表上的建设和翻新项目

获取原文
获取原文并翻译 | 示例
           

摘要

Pointing to services such as on-site machining and valve repair, which avoid the need for time-consuming removal of items from site to be worked on in a workshop, Furmanite Australia general manager Colin Bickerstaff said, "Measures such as these that will help to ensure allocated time is used with maximum efficiency is one of the keys to avoiding delays". Taking machining as an illustration, Mr Bickerstaff highlights numerous instances where being able to carry out the work in-situ has meant substantial time and cost savings. In one case on-site machining enabled a number of turbines at an Australian power station to be modified and upgraded to increase output within minimum timescales.
机译:Furmanite Australia总经理Colin Bickerstaff指出,服务涉及现场加工和阀门维修等服务,从而避免了费时的现场拆卸工作,而无需在车间进行处理,“这些措施将为您提供帮助。确保分配的时间以最大的效率使用是避免延误的关键之一”。 Bickerstaff先生以机加工为例,强调了无数实例,这些实例能够现场进行工作,意味着可以节省大量时间和成本。在一种情况下,现场加工使澳大利亚发电站的许多涡轮机得以修改和升级,以在最小时限内增加产量。

著录项

  • 来源
    《Energy Source & Distribution》 |2006年第mayajuna期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 TEO;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号