...
首页> 外文期刊>Energy Argus petroleum coke >Keystone XL could cost $10bn: TransCanada
【24h】

Keystone XL could cost $10bn: TransCanada

机译:TransCanada:Keystone XL可能耗资100亿美元

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The cost of the long-delayed Keystone XL oil pipeline could balloon to $10bn as court challenges against the bitumen line drag on, TransCanada said. The Alberta-to-Texas oil line has been in regulatory limbo since President Barack Obama rejected the northern section of the project during a dispute with Congress in 2012, four years after Calgary-based TransCanada applied for permits to build the pipeline. He said the company could reapply, but the process has been slowed repeatedly.
机译:TransCanada称,由于法院对沥青管线的质疑不断拖延,长期延期的Keystone XL输油管道的成本可能激增至100亿美元。自从巴拉克·奥巴马(Barack Obama)总统在2012年与国会的争端中拒绝了该项目的北部部分以来,阿尔伯塔省至得克萨斯州的输油管道一直处于监管状态,这是在总部位于卡尔加里的TransCanada申请建造该管道的许可证四年之后。他说,该公司可以重新申请,但过程一再被拖慢。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号