BENEFITS AND LESSONS LEARNED OF IMPLEMENTING BUILDING VIRTUAL DESIGN AND CONSTRUCTION (VDC) TECHNOLOGIES FOR COORDINATION OF MECHANICAL, ELECTRICAL, AND PLUMBING (MEP) SYSTEMS ON A LARGE HEALTHCARE PROJECT

机译:在大型卫生项目中实施机械,电气和管道系统(MEP)的虚拟虚拟建筑技术(VDC)技术的益处和经验教训

获取原文
获取原文并翻译 | 示例
       

摘要

Coordination of Mechanical, Electrical and Plumbing (MEP) systems is a huge challenge for many technical projects such as Healthcare projects, Bio-tech projects and projects in the area of Advanced Technology. The use of Building Information Modeling (BIM) or Virtual Design and Construction (VDC) tools and processes promises to address the challenges of the MEP coordination process. This case study presents the use of BIM/VDC tools and processes for the coordination of MEP systems on a USD96.9M healthcare project in Northern California, USA. discuss the challenges project team members faced in implementing the BIM/VDC tools and processes for MEP coordination, the specific quantitative and qualitative benefits from the use of BIM/VDC tools and processes that each project team member recognized and the lessons that the project team learned by implementing BIM/VDC tools and processes for the coordination of MEP systems. Some of the challenges we discuss include the creation and organization of the MEP coordination process using BIM/VDC tools, creation of the guidelines for the most efficient use of BIM/VDC tools for the process of conflict identification and resolution between the MEP subcontractors, and aligning the contractual interests of the coordination team to meet the overall project schedule. Some of the benefits that the project team achieved by using the BIM/VDC tools and processes for the coordination of the MEP systems include labor savings ranging from 20 to 30% for all the MEP subcontractors, 100% pre-fabrication for the plumbing contractor, only one recorded injury throughout the installation of MEP systems over a 250,000 square feet project area, less than 0.2% rework for the whole project for the mechanical subcontractor, zero conflicts in the field installation of the systems and only a handful of requests for information for the coordination of the MEP systems between contractors and the designers, and 6 months' savings on the schedule and about USD9M savings in cost for the overall project. The lessons the team learned include the level and type of details team members need to include to achieve benefits from the use of BIM/VDC tools for the coordination of MEP systems.
机译:机械,电气和卫生系统(MEP)系统的协调对于许多技术项目(例如医疗保健项目,生物技术项目和先进技术领域的项目)都是巨大的挑战。使用建筑信息模型(BIM)或虚拟设计与施工(VDC)工具和过程有望解决MEP协调过程中的挑战。本案例研究介绍了在美国北加利福尼亚一个9690万美元的医疗项目中,BIM / VDC工具和过程在MEP系统协调中的应用。讨论项目团队成员在实施BIM / VDC工具和过程以进行MEP协调时面临的挑战,使用每个项目团队成员认识到的BIM / VDC工具和过程所带来的具体定量和质量收益以及项目团队吸取的教训通过实施BIM / VDC工具和流程来协调MEP系统。我们讨论的一些挑战包括使用BIM / VDC工具创建和组织MEP协调流程,创建最有效地使用BIM / VDC工具进行MEP分包商之间的冲突识别和解决的准则,以及协调协调团队的合同利益,以满足整个项目进度。项目团队通过使用BIM / VDC工具和流程来协调MEP系统所获得的一些好处包括:为所有MEP分包商节省了20%到30%的劳动力,为水暖承包商进行了100%的预制,在250,000平方英尺的项目区域内,整个MEP系统的安装过程中仅记录了一次伤害,机械分包商的整个项目返工率不到0.2%,系统的现场安装中的冲突为零,并且仅有少量的信息请求承包商与设计师之间的MEP系统协调,按期节省了6个月的时间,整个项目节省了约900万美元的成本。团队获得的经验教训包括团队成员需要获得的详细信息的级别和类型,才能从使用BIM / VDC工具协调MEP系统中获得收益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号