...
首页> 外文期刊>International Journal of Mineral Processing >Production of high titania slag by Electro-Slag Crucible Melting (ESCM) process
【24h】

Production of high titania slag by Electro-Slag Crucible Melting (ESCM) process

机译:电渣坩埚熔炼(ESCM)工艺生产高二氧化钛渣

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In this research, ilmenite concentrate of Iran region successfully was smelted by Electro-Slag Crucible Melting (ESCM) process to produce TiO_2-rich slag as primary product and pig iron as by-product. Moreover, effects of reductant (carbon) amount and smelting time on TiO_2 and FeO content of slag and iron recovery were studied. It is found that addition of carbon excess to stoichiometric amount decreases the iron recovery and TiO_2 content in slag. If the smelting time keeps between 0 to 17 min, the TiO_2 content and iron recovery will be increased, whereas smelting time in excess of 17 min will cause products decline significantly. At optimum conditions, TiO_2 content in slag and the iron recovery are 70 wt. percent and 84 percent, respectively. Kinetic studies proved that the reduction of equivalent FeO was first-order reaction. The studies made by X-ray diffraction analysis showed that formation of the titanium sub-oxides (Ti_3O_5 and Ti_2O_3) causes the decrease in iron recovery and TiO_2 content.
机译:本研究通过电渣坩埚熔炼(ESCM)法成功冶炼了伊朗地区的钛铁矿精矿,生产出富含TiO_2的矿渣为主要产品,生铁为副产品。此外,研究了还原剂(碳)的数量和冶炼时间对炉渣中TiO_2和FeO含量以及铁回收率的影响。发现过量的碳以化学计量加入会降低铁的回收率和炉渣中TiO_2的含量。如果熔炼时间保持在0到17分钟之间,则TiO_2含量和铁的回收率将增加,而熔炼时间超过17分钟将导致产品显着下降。在最佳条件下,炉渣中TiO_2的含量和铁的回收率为70 wt。百分比和84%。动力学研究证明,当量FeO的还原是一级反应。 X射线衍射分析的研究表明,钛亚氧化物(Ti_3O_5和Ti_2O_3)的形成导致铁回收率和TiO_2含量下降。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号