首页> 外文期刊>E & P: A Hart Energy Publication >A critical component in early offshore installation design
【24h】

A critical component in early offshore installation design

机译:早期海上安装设计中的关键组件

获取原文
获取原文并翻译 | 示例
       

摘要

Integrating a well-defined HFE strategy into offshore installation design improves overall HSE and occupational performance, which ultimately can impact the bottom line. Lessons learned in the last two decades have resulted in more concentrated efforts to improve human performance and reduce human error through the introduction of Human Factors Engineering (HFE) into the design of offshore installations.
机译:将明确定义的HFE策略集成到海上安装设计中可改善总体HSE和职业绩效,这最终会影响底线。在过去的二十年中,通过将人为因素工程(HFE)引入海上设施的设计中,人们在提高人类绩效和减少人为错误方面进行了更加集中的努力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号