首页> 外文期刊>International Journal of Services and Operations Management >Evaluation of the mixed-model assembly line balancing problem with variable operation times and product mix
【24h】

Evaluation of the mixed-model assembly line balancing problem with variable operation times and product mix

机译:评估具有可变操作时间和产品组合的混合模型装配线平衡问题

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In order to make production systems more versatile and flexible, there has been a transition in the last decades towards mixed-model assembly lines, where all the products are variations of the same base product and only differ in specific customisable attributes. A mixed-model environment presents balancing problems (Mixed-model Assembly Line Balancing Problem or MALBP) that can normally be solved by transforming the mixed-model system into a Single Assembly Line Balancing Problem (SALBP), and simplified by creating a 'virtual average model'. In this case, a general average model not dependent on the characteristics of the real system can represent a considerable restriction since the reality is characterised by high variability in the operation times and product mix between different product models. A comparative evaluation of eight different methodologies to reduce a MALBP into a SALBP is presented, using several randomly generated problems, to test operation time fluctuations and the product mix. Their evaluation is based on five different performance measures.
机译:为了使生产系统更具通用性和灵活性,在过去的几十年中,已经向混合模型装配线过渡,在该模型中,所有产品都是同一基础产品的变体,仅在特定的可定制属性上有所不同。混合模型环境提出了平衡问题(混合模型装配线平衡问题或MALBP),通常可以通过将混合模型系统转换为单个装配线平衡问题(SALBP)来解决,并通过创建“虚拟平均值”来简化模型'。在这种情况下,不依赖于实际系统特征的通用平均模型可能会代表相当大的限制,因为现实的特征是不同产品模型之间的操作时间和产品组合变化很大。介绍了使用几种随机生成的问题,对将MALBP还原为SALBP的八种不同方法的比较评估,以测试操作时间波动和产品组合。他们的评估基于五个不同的绩效指标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号