首页> 外文期刊>Integrated manufacturing systems >Research note investigation of an additional part to optimal schedule
【24h】

Research note investigation of an additional part to optimal schedule

机译:对最佳计划的其他部分进行的研究笔记调查

获取原文
获取原文并翻译 | 示例
       

摘要

The pair-wise comparison technique has been applied to many algorithms for solving complicatedscheduling problems. The optimality gap between the pair-wise comparison technique andmathematical programming model is mainly due to deterioration in performance when optimal pairsof different sub-schedules are linked together to form a complete schedule. This paper investigatesthe effect of adding a part prior to the part-pair in a 2-part-2-machine optimal sub-schedule. Theconditions in which interchange of part-pair sequence is required in order to minimise or maintain themakespan when a part is added are analysed mathematically and the results are reported.
机译:逐对比较技术已应用于解决复杂调度问题的许多算法。逐对比较技术和数学规划模型之间的最优差距主要是由于将不同子计划的最优对链接在一起以形成一个完整的计划而导致的性能下降。本文研究了在2-part-2-machine最优子计划中,在零件对之前添加零件的效果。数学上分析了在添加零件时需要互换零件对顺序以最小化或保持制造周期的条件,并报告了结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号