...
首页> 外文期刊>Advanced Robotics: The International Journal of the Robotics Society of Japan >Time-optimal parabolic interpolation with velocity, acceleration, and minimum-switch-time constraints
【24h】

Time-optimal parabolic interpolation with velocity, acceleration, and minimum-switch-time constraints

机译:Time-optimal parabolic interpolation with velocity, acceleration, and minimum-switch-time constraints

获取原文
获取原文并翻译 | 示例

摘要

Time-optimal trajectories with bounded velocities and accelerations are known to be parabolic, i.e. piecewise constant in acceleration. An important characteristic of this class of trajectories is the distribution of the switch points - the time instants when the acceleration of any robot joint changes. When integrating parabolic trajectory generation into a motion planning pipeline, especially one that involves a shortcutting procedure, resulting trajectories usually contain a large number of switch points with a dense distribution. This high frequency acceleration switching intensifies joint motor wear as well as hampers the robot performance. In this paper, we propose an algorithm for planning parabolic trajectories subject to both physical bounds, i.e. joint velocity and acceleration limits, and the minimum-switch-time constraint. The latter constraint ensures that the time duration between any two consecutive switch points is always greater than a given minimum value. Analytic derivations are given, as well as comparisons with other methods to demonstrate the efficiency of our approach.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号