首页> 外文期刊>Indian Journal of Soil Conservation >FINANCIAL ANALYSIS OF SHALLOW TUBEWELLS - A CASE STUDY OF NALANDA DISTRICT
【24h】

FINANCIAL ANALYSIS OF SHALLOW TUBEWELLS - A CASE STUDY OF NALANDA DISTRICT

机译:浅管井的财务分析-以纳兰达地区为例

获取原文
获取原文并翻译 | 示例
           

摘要

An average installtion cost of shallow tubewells in Hilsa block of Nalada district of Bihar was estimated Rs- 12200. Annual working hours per tubewell were 632. Cost of irrigation per hour was worked out to be Rs. 16.25 and benefit cost ratio was more than 'one' on all size of farms. The internal rate of return was found more than 13 per cent.
机译:比哈尔邦纳拉达区Hilsa街区浅管井的平均安装成本估计为12200卢比。每管井的年度工作时间为632。每小时的灌溉成本为卢比。 16.25,在所有规模的农场中,收益成本比率均超过“一”。内部收益率被发现超过13%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号