We were working with a first-time client in Beverly Hills, It was a big job, a high-end two-story house, and the client contracted to have us do all the carpet, all the tile in the home; it was a nice job. There were three or four of us all told. I started with the tile in the master bathroom, so I laid the hoses from the bathroom all the way through the master bedroom, down the hall, down the stairs and into the truck. There I am, working away in the shower, when one of my helpers comes tearing into the room. "Gabriel! Gabriel! There's water coming down through the ceiling in the Jiving room!"
展开▼