首页> 外文期刊>Australian Manufacturing Technology >Lean implementation delivers on exports
【24h】

Lean implementation delivers on exports

机译:精益实施实现出口

获取原文
获取原文并翻译 | 示例
       

摘要

"Initially, we looked to improving productivity," said Macnaught CEO Robert Hilt. "With a small local market, a single export order can represent the equivalent of a month's worth of local orders. What we didn't have was the flexibility to respond quickly enough to those export orders and consequently our lead times would often be in the order of 10-12 weeks. The flow-on effect was variable demands on labour and inventory was difficult to forecast; we were running out of parts on a regular basis and working a lot of overtime."
机译:麦克诺特首席执行官罗伯特·希特说:“起初,我们希望提高生产率。” “在当地市场很小的情况下,单个出口订单就可以代表一个月的本地订单价值。我们所没有的就是灵活地对这些出口订单做出足够迅速的响应,因此我们的交货期通常在订单需要10到12周的时间。流水效应是对劳动力的需求不定,难以预测库存;我们经常缺货,而且要加班很多。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号