首页> 外文期刊>Argus FSU energy >Transneft hits the accelerator
【24h】

Transneft hits the accelerator

机译:Transneft加速器

获取原文
获取原文并翻译 | 示例
           

摘要

Transneft plans to launch the 900,000 b/d Zapolyarye-Purpe (Z-P) pipeline ahead of schedule in the first quarter of 2016, rather than the fourth quarter. But the line will remain half full for 1-2 years because development of the fields that will feed it is not progressing as swiftly as Transneft expected. The firm is laying the 520km line, which will link new Yamal-Nenets fields with the East Siberia-Pacific Ocean (ESPO) route, at a cost of $6.5bn. The Messoyakh fields, coowned by Rosneft and Gazpromneft, and the giant Russkoye field and the smaller Russko-Rechenskoye fields, owned by Rosneft, will be Z-P’s main crude sources, with the Messoyakh group alone due to provide 8mn t/yr (160,000 b/d) in 2020. Z-P is also expected to take crude from fields developed by the Novatek-Gazpromneft Severenergia consortium and Novatek’s Yarudeiskoye field.
机译:Transneft计划在2016年第一季度而不是第四季度提前启动900,000桶/天的Zapolyarye-Purpe(Z-P)管道。但是,这条生产线将在1-2年内保持一半的满负荷,因为为其提供动力的油田的开发进度并未像Transneft预期的那样迅速。该公司正在铺设520公里的线路,该线路将把Yamal-Nenets的新油田与东西伯利亚-太平洋(ESPO)路线连接起来,耗资65亿美元。 Rosneft和Gazpromneft共同拥有的Messoyakh油田,Rosneft拥有的巨型Russkoye油田和较小的Russko-Rechenskoye油田将是Z-P的主要原油来源,仅Messoyakh集团每年将提供800万吨(160,000吨) b / d),预计2020年ZP还将从Novatek-Gazpromneft Severergya财团和Novatek Yarudeiskoye油田开发的油田中提取原油。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号