...
首页> 外文期刊>Argus nefte transport >Transneft hits the accelerator
【24h】

Transneft hits the accelerator

机译:Transneft加速器

获取原文
获取原文并翻译 | 示例
           

摘要

Transneft plans to launch the 900,000 b/d Zapolyarye-Purpe (Z-P)pipeline ahead of schedule in the first quarter of 2016, rather than the fourth quarter.But the line will remain half full for 1-2 years because development of the fields that will feed it is not progressing as swiftly as Transneft expected. The firm is laying the 520km line,which will link new Yamal-Nenets fields with the East Siberia-Pacific Ocean (ESPO)route,at a cost of$6.5bn.The Messoyakh fields,co-owned by Rosneft and Gazpromneft,and the giant Russkoye field and the smaller Russko-Rechenskoye fields,owned by Rosneft,will be Z-P’s main crude sources,with the Mes-soyakh group alone due to provide 8mn t/yr(160,000 b/d)in 2020.Z-P is also expected to take crude from fields devel-oped by the Novatek-Gazpromneft Severenergia consortium and Novatek’s Yarudeiskoye field.
机译:Transneft计划在2016年第一季度而不是第四季度提前启动900,000桶/天的Zapolyarye-Purpe(ZP)管道,但该管道将在1-2年内保持半满,因为该油田的开发会喂它没有像Transneft预期的那样迅速进行。该公司正在铺设520公里的线路,该线路将连接新的Yamal-Nenets油田与东西伯利亚-太平洋(ESPO)路线,耗资65亿美元。由Rosneft和Gazpromneft共同拥有的Messoyakh油田以及俄罗斯石油公司拥有的Russkoye油田和较小的Russko-Rechenskoye油田将成为Z-P的主要原油来源,仅Mes-soyakh集团将在2020年提供800万吨/年(160,000桶/日)的产量。从Novatek-Gazpromneft Severenergia财团和Novatek的Yarudeiskoye油田开发的油田中提取原油。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号