首页> 外文期刊>Arab Steel >Al Gaith Holdings: Integrated Iron and Steel Project in Sahar Industrial Zone
【24h】

Al Gaith Holdings: Integrated Iron and Steel Project in Sahar Industrial Zone

机译:Al Ghaith Holdings:苏哈尔工业区的钢铁综合项目

获取原文
获取原文并翻译 | 示例
           

摘要

During the second half of January 2005 signature has been made in Muscat, Oman Sultanate, of a contract for setting up of an integrated iron and steel project in Sahar port region at a total cost of 750 million U.S. dollars. The contract was signed on 17.1.2005 by the Omani Minister of Economy Sheikh Mohammad Ali Al Maki from the Omani side and by Mr. Al-Gaith, Chairman of the Emirates Holding Al Gaith Company on behalf of this company. The project will be executed on three stages extending until 2010. It is hopeful that production of the first stage will start in the first quarter of 2007. When the three stages are completed the annual production capacity of this project will reach 4 million tons of iron ore pellets and hot-bri-quetted iron. It will have 588 workers and will consume 0.33 million cubic meters of natural gas for 20 years.
机译:2005年1月下半月在阿曼苏丹国马斯喀特签署了一项在萨哈尔港口地区建立钢铁综合项目的合同,总费用为7.5亿美元。阿曼经济部长谢赫·穆罕默德·阿里·阿尔·马基(Sheikh Mohammad Ali Al Maki)从阿曼方面与阿联酋航空控股的Al Gaith公司董事长Al-Gaith先生于2005年1月17日签署了该合同。该项目将分三个阶段执行,一直延续到2010年。第一阶段的生产有望在2007年第一季度开始。三个阶段完成后,该项目的年铁产能将达到400万吨矿石球团和热轧铁块。它将拥有588名工人,并将在20年内消耗33万立方米的天然气。

著录项

  • 来源
    《Arab Steel》 |2005年第346期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 冶金工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号