首页> 外文期刊>Arab Oil & Gas Magazine >Takreer Studying the Construction of a New 417,000-B/D Oil Refinery in Ruwais
【24h】

Takreer Studying the Construction of a New 417,000-B/D Oil Refinery in Ruwais

机译:塔克雷尔研究鲁韦斯新建的417,000-B / D炼油厂

获取原文
获取原文并翻译 | 示例
           

摘要

Abu Dhabi Oil Refining Company (Takreer) is studying plans for the development of a new refinery in Ruwais,according to the company's Managing Director,Mr.Jasem Ali Sayegh.Addressing the 9th annual meeting of the Middle East Refining Conference,Mr.Sayegh indicated that the new plant would have a capacity of 417,000 b/d and was due to be in production by 2013.The project is currently at the front-end engineering and design (FEED) stage,and if it is given the go-ahead,it would increase Abu Dhabi's total refining capacity to 902,000 b/d from 485,000 b/d at present.
机译:据阿布扎比常务董事贾塞姆·阿里·萨耶格(Jasem Ali Sayegh)先生说,阿布扎比炼油公司(Takreer)正在研究在Ruwais兴建一座新炼油厂的计划。新工厂的产能为417,000桶/天,将于2013年投产。该项目目前处于前端工程与设计(FEED)阶段,如果得到批准,它将使阿布扎比的总精炼能力从目前的485,000桶/天增加到902,000桶/天。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号