首页> 外文期刊>Arab Oil & Gas >Takreer Finalizes Construction Contract Awarded to Samsung Engineering for Carbon Black and Deferred Coking Facilities
【24h】

Takreer Finalizes Construction Contract Awarded to Samsung Engineering for Carbon Black and Deferred Coking Facilities

机译:Takreer敲定了三星工程公司授予的炭黑和焦化焦化设施建设合同

获取原文
获取原文并翻译 | 示例
       

摘要

Abu Dhabi Oil Refining Company (Takreer), a subsidiary of Abu Dhabi National Oil Company (ADNOC), has finalized the EPC (engineering, procurement and construction) contract it awarded in July to the South Korean company Samsung Engineering for the installation of carbon black and deferred coking (CBDC) facilities in the Ruwais refinery. The contract is worth an estimated $3.48 billion (AOG, 1 July).
机译:阿布扎比国家石油公司(ADNOC)的子公司阿布扎比炼油公司(Takreer)已完成其于7月份与韩国三星工程公司签订的EPC(工程,采购和建筑)合同,以安装炭黑。以及Ruwais炼油厂的延迟焦化(CBDC)设施。该合同价值估计为34.8亿美元(AOG,7月1日)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号