...
首页> 外文期刊>Arab Oil & Gas >Petronas Could Pull Out of the South Pars Phase 11 Project,Whereas Total Has Confirmed its Commitment
【24h】

Petronas Could Pull Out of the South Pars Phase 11 Project,Whereas Total Has Confirmed its Commitment

机译:国油可能退出南帕尔斯11期项目,而道达尔已确认其承诺

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Malaysian national oil company Petronas,which is very active in Iran,recently intimated that it was really not happy about the contractual terms proposed by Iran for phase 11 of the development of the South Pars gas field.Phase 11 is to be associated with a downstream liquefied natural gas(LNG)export project,Pars LNG,for which Petronas(20%)and Total(30%)are negotiating with the National Iranian Oil Company(NIOC).Petronas explained that it might pull out of the South Pars phase 11 project if the commercial terms did not correspond to its investment criteria,and a decision on that is due to be taken shortly.
机译:在伊朗非常活跃的马来西亚国家石油公司Petronas最近暗示,对于伊朗提议的南帕尔斯气田开发第11阶段的合同条款,它真的不满意。第11阶段将与一个下游液化天然气(LNG)出口项目Pars LNG,国家石油公司(NIOC)正在与国油(Petronas)(20%)和道达尔(Total)(30%)进行谈判。Petronas解释说,它有可能退出南帕尔斯阶段如果商业条款不符合其投资标准,则将在第11个项目中作出决定,并将很快对此做出决定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号