首页> 外文期刊>Arab Oil & Gas >Around 70 Wells to Be Drilled at Rumaila in 2010
【24h】

Around 70 Wells to Be Drilled at Rumaila in 2010

机译:Rumaila将于2010年钻探约70口井

获取原文
获取原文并翻译 | 示例
           

摘要

BP and its associates have started work on the redevelopment of the Rumaila field by awarding the main drilling contracts at the end of March. Seven additional drilling rigs will be deployed at the field starting in the second half of this year. The British company plans to have some 70 wells drilled at Rumaila during the course of 2010. BP and China National Petroleum Corporation (CNPC) were contracted to redevelop Rumaila following the first international bid round that closed in June 2009 and have undertaken to step up production at Iraq's largest oil field to 2.85 million b/d during the second half of this decade, as against a little over 1 million b/d at the moment.
机译:BP及其员工已于3月底授予主要钻探合同,从而开始了Rumaila油田的再开发工作。从今年下半年开始,将在现场部署另外七个钻机。这家英国公司计划在2010年期间在鲁迈拉(Rumaila)钻探约70口井。在2009年6月第一轮国际招标结束后,BP和中国石油天然气集团公司(CNPC)签订了重建鲁迈拉的合同,并已承诺提高产量。伊拉克最大油田的原油产量在本十年的后半段达到了285万桶/天,而目前只有100万桶/天。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号