...
首页> 外文期刊>Energy in East Europe >Greek firm tests Crimean wind
【24h】

Greek firm tests Crimean wind

机译:希腊公司测试克里米亚风

获取原文
获取原文并翻译 | 示例
           

摘要

The chairman of Verkhovna Rada of the Autonomous Republic of Crimea and the chairman of the Crimean Council of Ministers met January 11 with a Greek delegation consisting of representatives of companies Prenecon Prime Energy Construction and Enercon Hellas, Ukraine consultants Imepower said January 25. The parties discussed the terms and stages of implementation of an investment project to build a wind park at an estimated cost of ?1.7 billion. A joint working group, consisting of Greek and Crimean specialists on wind energy, which was created within the framework of an agreement on cooperation between the Council of Ministers of Autonomous Republic of Crimea and Prenecon signed in 2009, investigated possible sites and made a preliminary wind estimation in the Pervomayskiy, Razdol'nenskiy, Krasnoperekopskiy and Leninkiy regions.
机译:国家主席的自治克里米亚和共和国的主席克里米亚部长理事会1月11日会见了希腊代表团的代表组成公司Prenecon '能源建设海勒斯接近和风力,乌克兰顾问Imepower1月25日说。和实施阶段的投资项目建立一个风力公园估计成本17亿?。希腊和克里米亚专家组成风能,在创建的框架合作协议自治共和国的部长理事会克里米亚和Prenecon签署了2009年,可能网站和做了一个调查Pervomayskiy风初步估计,地区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号