首页> 外文期刊>Applied mathematics and computation >A new LMI solution in the L-1 optimal problem for wind turbine-induction generator unit
【24h】

A new LMI solution in the L-1 optimal problem for wind turbine-induction generator unit

机译:风机感应发电机组L-1最优问题中的新LMI解决方案

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

An application of a new L-1-optimal control technique based on linear matrix inequality optimization to a wind turbine-induction generator unit is presented. The new technique, which is proposed as an algorithm, combines the original concept of peak-to-peak gain of designed system with optimal control theory and employs a free design parameter allowing for a flexible management of the tradeoff between robustness to disturbance signals and magnitude of the worst peak-to-peak gain of the design system. For solving this non convex problem,, using several transfer function for linearization and linear matrix inequality optimization approach. For the convergence of this algorithm, a scope is found on the basis of the H-infinity-norm. If the length of this interval is small, we have a good estimate of the actual optimal peak-to-peak gain that is achievable by control. Application to the wind turbine-induction generator unit provides fast response with a good steady state error, suitable settling time and stability upon severe wind gust.
机译:提出了一种基于线性矩阵不等式优化的L-1最优控制技术在风力发电机感应发电机组中的应用。作为一项算法提出的新技术将设计系统的峰峰值增益的原始概念与最优控制理论相结合,并采用了免费的设计参数,从而可以灵活地管理对干扰信号的鲁棒性和幅度的权衡取舍。设计系统最差的峰峰值增益。为了解决这个非凸性问题,使用几个传递函数进行线性化和线性矩阵不等式优化的方法。为了收敛该算法,在H-无穷范数的基础上找到了一个范围。如果此间隔的长度较小,则我们可以很好地估算出可以通过控制实现的最佳峰峰值增益。应用于风力涡轮机感应发电机组可提供快速响应,并具有良好的稳态误差,合适的建立时间和在严重阵风时的稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号