...
首页> 外文期刊>CoalTrans international >Muuga coal terminal opens for business
【24h】

Muuga coal terminal opens for business

机译:Muuga煤码头打开业务

获取原文
获取原文并翻译 | 示例

摘要

TKF was appointed general contractor for the Tallinn project in 2003, the scope of the contract covering plant and machinery for the first stage of Muuga Coal Terminal. The turnkey contract comprised a stacker, bucket wheel reclaimer and a shiploader, as well as the connecting conveyor systems plus auxiliary installations such as a coal crushers and graders, sampling stations, snow clearers on the conveyor systems, electrical installation, central control station and automation etc.
机译:TKF被任命为总承包商2003年塔林项目的范围合同覆盖了工厂和机械的的第一阶段Muuga煤码头。合同由堆垛机、斗轮堆取料机、装船机以及连接输送机系统+辅助安装如煤炭破碎机和年级,抽样,雪的清算所输送机系统、电气安装中央控制站和自动化等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号