首页> 外文期刊>NGW's Gas Market Reconnaissance >Entergy Texas is seeking approval to construct the Orange County Advanced Power Station, a 1,215 megawatt, dual fuel combined cycle power facility.
【24h】

Entergy Texas is seeking approval to construct the Orange County Advanced Power Station, a 1,215 megawatt, dual fuel combined cycle power facility.

机译:Entergy Texas正在寻求批准,建造橙县先进的电站,1,215兆瓦,双燃料联合循环电力设施。

获取原文
获取原文并翻译 | 示例
           

摘要

The plant will be located near Bridge City, Texas, and will be capable of powering more than 230,000 homes and use a combination of natural gas and hydrogen. Hydrogen produces zero carbon emissions as a fuel source for electric generation.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号