...
首页> 外文期刊>International Journal of Operational Research >Asset management strategies for wind turbines: keeping or retrofitting existing wind turbines?
【24h】

Asset management strategies for wind turbines: keeping or retrofitting existing wind turbines?

机译:风力涡轮机的资产管理策略:保持或改造现有的风力涡轮机?

获取原文
获取原文并翻译 | 示例

摘要

In this study, a parallel replacement problem with retrofitting (PRP-R) model is proposed to determine the trade-off between retrofitting and replacing an asset. The primary objective is to identify the replacement, maintenance and retrofitting schedule that optimise purchasing new assets, operation and maintenance (O&M) cost, and retrofitting cost under budget and production constraints resulting in a mixed-integer linear programming formulation. This model is applied to a case study of energy industry involving wind turbines (WTs). Results show that due to a lower O&M cost, retrofitting is less costly than keeping the WTs. In addition, the effects of key parameters such as O&M cost, retrofitting cost, budget allocated for retrofitting and governmental subsidy on the optimal replacement policy on total cost are studied. This research contributes a model that can be used to determine if WT retrofitting is economically justified and provides a rigorous analytical framework for optimising the decision-making process over the wind farm life cycle.
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号