...
首页> 外文期刊>Anesthesia and Analgesia: Journal of the International Anesthesia Research Society >Numbers of simultaneous turnovers calculated from anesthesia or operating room information management system data.
【24h】

Numbers of simultaneous turnovers calculated from anesthesia or operating room information management system data.

机译:根据麻醉或手术室信息管理系统数据计算出的同时周转次数。

获取原文
获取原文并翻译 | 示例

摘要

BACKGROUND: More personnel are needed to turn over operating rooms (ORs) promptly when there are more simultaneous turnovers. Anesthesia and/or OR information management system data can be analyzed statistically to quantify simultaneous turnovers to evaluate whether to add an additional turnover team. METHODS: Data collected for each case at a six OR facility were room, date of surgery, time of patient entry into the OR, and time of patient exit from the OR. The number of simultaneous turnovers was calculated for each 1 min of 122 4-wk periods. Our end point was the reduction in the daily minutes of simultaneous turnovers exceeding the number of teams caused by the addition of a team. RESULTS: Increasing from two turnover teams to three teams reduced the mean daily minutes of simultaneous turnovers exceeding the numbers of teams by 19 min. The ratio of 19 min to 8 h valued the time of extra personnel as 4.0% of the time of OR staff, surgeons, and anesthesia providers. Validity was suggested by other methods of analyses also suggesting staffing for three simultaneous turnovers. Discrete-event simulation showed that the reduction in daily minutes of turnover times from the addition of a team would likely match or exceed the reduction in the daily minutes of simultaneous turnovers exceeding the numbers of teams. Confidence intervals for daily minutes of turnover times achieved by increasing from two to three teams were calculated using successive 4-wk periods. The distribution was sufficiently close to normal that accurate confidence intervals could be calculated using Student's t distribution (Lilliefors' test P = 0.58). Analysis generally should use 13 4-wk periods as increasing the number of periods from 6 to 13 significantly reduced the coefficient of variation of the averages but not increasing the number of periods from 6 to 9 or from 9 to 13. CONCLUSION: The number of simultaneous turnovers can be calculated for each 1 min over 1 yr. The reduction in the daily minutes of simultaneous turnovers exceeding the number of teams achieved by the addition of a turnover team can be averaged over the year's 13 4-wk periods to provide insight as to the value (or not) of adding an additional team.
机译:背景:当同时发生更多人员流动时,需要更多的人员迅速上交手术室(OR)。可以对麻醉和/或OR信息管理系统数据进行统计分析,以量化同时发生的人员流动,以评估是否增加额外的人员流动团队。方法:在六个OR机构为每个病例收集的数据为房间,手术日期,患者进入OR的时间以及患者退出OR的时间。计算122个4-wk周期中每1分钟的同时周转次数。我们的目标是减少因增加团队而导致的同时营业额的每日分钟数减少,从而超过团队人数。结果:从两个周转团队增加到三个团队减少了同时周转的平均每日分钟数,超过了团队人数19分钟。 19分钟与8小时的比率将额外人员的时间视为手术室人员,外科医生和麻醉提供者时间的4.0%。其他分析方法也证明了有效性,也建议同时进行三项人员流动。离散事件模拟显示,从增加一个团队开始,每天的周转时间减少可能会等于或超过同时发生的周转时间超过团队数目的减少天数。使用连续的4周周期,计算从两支球队增加到三支球队所获得的每日换手时间的分钟置信区间。该分布足够接近正态分布,因此可以使用学生的t分布来计算准确的置信区间(Lilliefors检验P = 0.58)。分析通常应使用13个4-wk周期,因为将周期数从6增加到13会显着减小平均值的变异系数,但不能将周期数从6增加到9或从9到13。结论:可以计算1年中每1分钟的同步营业额。可以通过在一年的13个4周内平均增加同时营业额减少的每日分钟数,以超过增加营业额团队所能达到的球队数目,以了解增加(或不增加)额外球队的价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号