首页> 外文期刊>Промышленная Теплотехника >The application of double-circuit steam turbine power installations under conditions of geothermal deposits in Ukraine
【24h】

The application of double-circuit steam turbine power installations under conditions of geothermal deposits in Ukraine

机译:双电汽轮机电力装置在乌克兰地热沉积物条件下的应用

获取原文
获取原文并翻译 | 示例
           

摘要

The brief review of the stafe of the geothermal energetics in Ukraine is presented. Under up-to-day conditions the construction of double - circuit geothermal heat power plants (GHPP) on low boiling working bodies (LBWB) is per-spektive in Ukraine. The improved methodics of calculation of thermodynamic characteristics of geothermal power installations is developed. The predicted calculating characteristics of GMPP on LBWB are given for two per-spektive deposits of geothermal waters in Ukraine.
机译:介绍了乌克兰地热能浮现的简要审查。 在最新条件下,在乌克兰的低沸腾工作机构(LBWB)上的双电影热发电厂(GHPP)的构建是在乌克兰的每种SPEKTIVE。 开发了地热电装置热力学特性计算的改进方法。 LBWB上的GMPP的预测计算特性对于乌克兰地热水的两个每种Spektive沉积物给出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号