Multi-purpose pumping stations for the North-Chiba Water Conveyance Project

机译:北千叶水输送工程多用途泵站

获取原文
获取原文并翻译 | 示例
           

摘要

Ebara has designed, produced, and installed pump equipment for two multi-purpose pumping stations as part of the North-Chiba Water Conveyance Project, a 20-year project just completed whose objective lies in minimizing water pollution and establishing a water source. The total length of the waterway built in this large-scale project extends 30 kilometers. The following, the first report of a series, introduces specific pumping problems that had to be solved, as well as coordinated pumping operation by the two stations, flow rate control, and measures against water hammer effects. The topics discussed are flow rate control for maintaining the level of a closed portion of the waterway to be below the standard dam discharge level, operation conditions involving pump head fluctuation caused by the amount of water conveyance, water hammer prevention using one-way surge tanks (tank area: about 250 m{sup}2), and pumping conditions when the set level of the one-way surge tanks is higher than the discharge level.
机译:EBARA为两家多用途泵站设计,生产和安装了泵设备,作为北千叶水运输工具的一部分,刚刚完成的20年项目,其目的在于最小化水污染并建立水源。在这个大型项目中建造的水道的总长度延伸30公里。以下是一系列的第一个报告,介绍了必须解决的具体泵送问题,以及通过两个站,流量控制和防水锤效应的测量协调泵送操作。所讨论的主题是用于保持水路的封闭部分的水平的流量控制,以低于标准坝放电水平,操作条件涉及泵头波动引起的水输送量,使用单向电涌坦克的水锤预防(坦克面积:约250 m {sup} 2),当单向电涌罐的设定水平高于放电水平时,抽取条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号