Multi-purpose pumping stations for the North-Chiba Water Conveyance Project

机译:北千叶输水项目的多功能泵站

获取原文
获取原文并翻译 | 示例
           

摘要

Ebara has designed, produced, and installed pump equipment for two multi-purpose pumping stations as part of the North-Chiba Water Conveyance Project, a 20-year project just completed whose objective lies in minimizing water pollution and establishing a water source. The total length of the waterway built in this large-scale project extends 30 kilometers. The following, the first report of a series, introduces specific pumping problems that had to be solved, as well as coordinated pumping operation by the two stations, flow rate control, and measures against water hammer effects. The topics discussed are flow rate control for maintaining the level of a closed portion of the waterway to be below the standard dam discharge level, operation conditions involving pump head fluctuation caused by the amount of water conveyance, water hammer prevention using one-way surge tanks (tank area: about 250 m{sup}2), and pumping conditions when the set level of the one-way surge tanks is higher than the discharge level.
机译:作为北千叶水利输送项目的一部分,原为两个多功能泵站设计,生产和安装了泵设备,该项目已完成了20年,其目标是最大程度地减少水污染和建立水源。该大型项目建设的水路总长达30公里。以下是该系列的第一个报告,介绍了必须解决的特定泵送问题,以及两个站点的协调泵送操作,流量控制以及针对水锤效应的措施。讨论的主题包括流量控制,以使水路的封闭部分的水位保持在标准大坝排放水位以下;运行条件涉及由输水量引起的泵压头波动;使用单向调压水箱防止水击(油箱面积:约250 m {sup} 2),以及单向调节油箱的设定水位高于排放水位时的泵送条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号