Hydropower plants in Poland currently use only 19% of the river’s energy potential. Development of hydropower is limited by environmental regulations as well as by economic grounds. From the environmental point of view, it is desirable to build small hydropower plants integrated into the local landscape. This paper presents results of the research aimed at estimating the amount of energy that could be produced in the case of small hydroelectric power plants on weirs existing on the Ty?mienica River. There is also a legal framework that should be adapted at hydropower development. It was calculated that the technical capacity of the small hydropower plants that could be built on 4 existing weirs, is 0.131 MW. These power plants could produce 786 MWh of electricity per year. The economic efficiency of this production is currently difficult to assess, because a new support system for renewable energy sources is currently being implemented, which will be a decisive factor for entrepreneurs. It should be borne in mind that potential investments will be made in protected areas within the Natura 2000 network, which may limit their constructing or impose the obligation to assess their impact on selected environmental elements. Location within the protective area does not eliminate such investments, especially when solutions with the least possible environmental impact are used.
机译:波兰水电站目前仅使用19%的河流的能源潜力。水电的发展受环境法规的限制以及经济理由。从环境的观点来看,希望将小型水电站构建集成到当地景观中。本文提出了旨在估算在TYS的堰上的小型水力发电设备的能量所产生的能源的结果。还有一个法律框架,应适用于水电开发。计算出可以在4个现有堰上建造的小型水电站的技术能力为0.131兆瓦。这些电厂每年可以生产786兆瓦的电力。该生产的经济效率目前难以评估,因为目前正在实施新的可再生能源的支持系统,这将是企业家的决定性因素。应记住,潜在的投资将在Natura 2000网络中的受保护区进行,这可能会限制其构建或履行评估其对选定环境要素的影响的义务。保护区内的位置不会消除此类投资,特别是当使用可能对环境影响最少的解决方案时。

著录项

  • 来源
  • 作者单位

    University of Life Sciences in Lublin Faculty of Production Engineering Department of Environmental Engineering and Geodesy ul. Leszczyńskiego 7 20-069 Lublin Poland;

    University of Life Sciences in Lublin Faculty of Production Engineering Department of Environmental Engineering and Geodesy ul. Leszczyńskiego 7 20-069 Lublin Poland;

    University of Life Sciences in Lublin Faculty of Production Engineering Department of Environmental Engineering and Geodesy ul. Leszczyńskiego 7 20-069 Lublin Poland;

    University of Life Sciences in Lublin Faculty of Production Engineering Department of Environmental Engineering and Geodesy ul. Leszczyńskiego 7 20-069 Lublin Poland;

    University of Life Sciences in Lublin Faculty of Production Engineering Department of Environmental Engineering and Geodesy ul. Leszczyńskiego 7 20-069 Lublin Poland;

    University of Life Sciences in Lublin Faculty of Production Engineering Department of Environmental Engineering and Geodesy ul. Leszczyńskiego 7 20-069 Lublin Poland;

    University of Life Sciences in Lublin Faculty of Production Engineering Department of Environmental Engineering and Geodesy ul. Leszczyńskiego 7 20-069 Lublin Poland;

    University of Life Sciences in Lublin Faculty of Production Engineering Department of Environmental Engineering and Geodesy ul. Leszczyńskiego 7 20-069 Lublin Poland;

    University of Life Sciences in Lublin Faculty of Production Engineering Department of Environmental Engineering and Geodesy ul. Leszczyńskiego 7 20-069 Lublin Poland;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 农业科学;
  • 关键词

    alternative energy sources; ecoenergetics; hydropower; small hydropower plants; water-damming devices;