...
首页> 外文期刊>Journal of Performance of Constructed Facilities >Settlement Characteristics of Jacked Box Tunnelin underneath a Highway Embankment
【24h】

Settlement Characteristics of Jacked Box Tunnelin underneath a Highway Embankment

机译:高速公路堤坝下脱落箱隧道的沉降特征

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The rapid expansion of urban road systems inevitably results in engineering challenges when new road construction requires the safe crossing of existing roads. Therefore, there has been increased interest in box culvert jacking construction and specifically in the novel jacking method of box culvert shield jacking that combines the principles of box jacking and shield tunneling and is a safe approach for underpass projects. In this study, an underpass of a new road running under an existing highway in Zhengzhou, China was constructed using the box culvert shield jacking method. The objectives of the study were to introduce the novel construction and to investigate the development of the settlement characteristics of the existing highway. A numerical analysis was used to establish a three-dimensional numerical model, which was validated by field measurements. The results showed that (1) the novel box jacking method is safe, feasible, and successful;;(2) along the jacking direction, the highway settlement gradually decreased from the entrance (south) to the exit (north);;(3) during the process of jacking, the settlement behavior of the existing highway underwent three stages, namely slow growth, rapid growth, and a steady stage. A parametric study included investigations of the length of the shield and the lag distance between the central soil and the shield face. These results provide information for similar projects and help to improve box jacking construction.
机译:城市道路系统的快速扩张不可避免地导致工程挑战,当时新的道路施工需要安全交叉的现有道路。因此,对箱子涵洞施工的兴趣较高,特别是在盒子罩屏蔽的小型顶升方法中,结合了箱顶和盾构隧道的原理,是一种安全的地下通道项目方法。在这项研究中,在郑州现有公路下运行的新道路的地下通道采用盒子涵洞盾牌升降方法构建。该研究的目标是介绍新颖的建设,并调查现有公路的沉降特征的发展。使用数值分析来建立三维数值模型,通过现场测量来验证。结果表明,(1)新颖的箱顶胶片方法是安全,可行的,成功的;(2)沿着顶升方向,公路沉降从入口(南)逐渐减少到出口(北);;(3 )在超顶的过程中,现有高速公路的沉降行为进行了三个阶段,即增长缓慢,增长快,稳定阶段。参数研究包括调查屏蔽的长度和中央土壤和屏蔽面之间的滞后距离。这些结果提供了类似项目的信息,并有助于提高箱顶建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号