首页>
外国专利>
METHOD FOR CORRECTING PARTIAL SETTLEMENT OF WOODEN BUILDING, AND JACK HOLDER FOR CORRECTING SETTLEMENT OF WOODEN BUILDING
METHOD FOR CORRECTING PARTIAL SETTLEMENT OF WOODEN BUILDING, AND JACK HOLDER FOR CORRECTING SETTLEMENT OF WOODEN BUILDING
展开▼
机译:校正木建筑局部沉降的方法和用于校正木建筑沉降的千斤顶
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a method for correcting partial settlement of a wooden building, which can be practiced even in a small place.;SOLUTION: A wooden sill 84 of the wooden building is uplifted separately from a foundation 83, so that the partial settlement of the wooden building can be corrected, and a filler 93 is infilled between the uplifted wooden sill and the foundation.;COPYRIGHT: (C)2005,JPO&NCIPI
展开▼