首页> 外文期刊>Journal of Performance of Constructed Facilities >EVOLUTION OF FORMAL MAINTAINABILITY PROGRAM FOR LARGE MANUFACTURING COMPANY
【24h】

EVOLUTION OF FORMAL MAINTAINABILITY PROGRAM FOR LARGE MANUFACTURING COMPANY

机译:大型制造业公司正式可维护性计划的演变

获取原文
获取原文并翻译 | 示例
       

摘要

This case study presents maintainability implementation by means of a formal program developed by a manufacturing company. The manufacturing company's ultimate goal is optimal production availability. Accordingly, projects are planned and designed with a long-term vision that recognizes the importance of life-cycle costs. This relatively new maintainability program addresses the plan and design for maintenance in equipment and facility projects, both new and retrofit. Elements of the formal maintainability program will be described through the model process for implementing maintainability as defined by the Construction Industry Institute, along with qualitative implementation costs and benefits. Additionally, an example of a successful project-level implementation, the clean room project, will be presented.
机译:本案研究通过由制造公司开发的正式计划提供可维护性实施。 制造公司的最终目标是最佳的生产可用性。 因此,计划和设计项目,具有长期愿景,以认识到生命周期成本的重要性。 这种相对较新的可维护性计划解决了设备和设施项目维护的计划和设计,包括新的和改造。 正式可维护性计划的要素将通过模型过程来实施,以实施建筑业学院所定义的可维护性,以及定性实施成本和福利。 此外,将介绍一个成功的项目级别实现,洁净室项目的示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号