【24h】

Bowleven Cameroon project cost cut hopes

机译:喀麦隆Bowleven项目削减成本的希望

获取原文
获取原文并翻译 | 示例
       

摘要

Bowleven may be able to halve the number of wells it needs for its hub and spoke project offshore Cameroon following final test results from its latest appraisal well. The final test on the IM-5 well in MLHP-7 was on the newly uncovered Intra Isongo interval and follows on from the test on the previously discovered Middle Isongo which flowed at a maximum rate of 23 MMcf/d of gas and 3,155 b/d of condensate.
机译:根据最新评估井的最终测试结果,Bowleven可能能够将其在喀麦隆近海的轮辐项目所需的油井数量减少一半。对MLHP-7的IM-5井的最终测试是在新发现的Inson Isongo区间进行的,接着是对先前发现的中间Isongo的测试,该中间Isongo的最大流量为23 MMcf / d的天然气和3,155 b / d冷凝水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号