【24h】

Gulf Island grabs VAALCO Gabon goodies

机译:海湾岛抢购VAALCO加蓬美食

获取原文
获取原文并翻译 | 示例
       

摘要

Gulf Island has beaten off the competition to win the deal for the first of two platform contracts for VAALCO off Gabon. The US independent had put McDermott in charge of the design engineering and procurement management for the new platform destined for the already producing Etame field on the Etame Marin block. It in turn asked a selection of Gulf of Mexico contractors to bid late last year and came up with the fast-track recommendation last week.
机译:海湾岛击败了竞争对手,赢得了加蓬外的VAALCO的两个平台合同中的第一份合同。这家美国独立公司由McDermott负责新平台的设计工程和采购管理,该平台预定用于Etame Marin区块已经生产的Etame油田。反过来,它要求选定的墨西哥湾承包商于去年下半年竞标,并在上周提出了快速通道建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号