首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Phased Senegal SNE project to need up to 80 wells
【24h】

Phased Senegal SNE project to need up to 80 wells

机译:塞内加尔SNE分阶段工程需要多达80口井

获取原文
获取原文并翻译 | 示例
       

摘要

One of the partners in Cairn Energy's SNE discovery off Senegal has revealed details of the pre-engineering study results. The report by AMOG consulting was commissioned by Australia's FAR and based on its new reserves figure of 641m bbl for the deepwater field. The development concept is based on 70-80 development wells through field life with an equal split between producers and injectors. Each would recover around 8m bbl of oil and the first phase would involve around 20 to 25 wells. The project is at the pre-FEED stage with the focus on optimising and scaling a first phase development project.
机译:凯恩能源公司在塞内加尔的SNE发现中的一位合作伙伴透露了工程前研究结果的细节。 AMOG咨询公司的报告是受澳大利亚FAR委托,基于其深水油田的新储量6.41亿桶。该开发概念基于整个生命周期中的70-80口开发井,生产者和注入者之间的分配相等。每个阶段将采收约800万桶石油,第一阶段将涉及约20至25口井。该项目处于FEED前阶段,重点在于优化和扩展第一阶段的开发项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号