...
首页> 外文期刊>World Steel Capacity News >JSW USA TO START HOT TRIALS AT ACERO JUNCTION
【24h】

JSW USA TO START HOT TRIALS AT ACERO JUNCTION

机译:JSW USA开始在Acero Junction开始热试

获取原文
获取原文并翻译 | 示例
           

摘要

On December 13, JSW USA expects to conduct test run of steel meltshop at ACERO Junction in Ohio, following about 9 years of shutdown. The producer may complete equipment re-commissioning by end-2018, Metal Expert learnt from local sources. ACERO Junction employs a 2.2 million tpy EAF, a LF, a 2-strand slab CCM (2.8 million tpy) and a 3 million tpy hot strip mill 80”. The investment in the revamp and re-commission of steel meltshop, as well as in modernization of rolling mill is estimated at USD 250 million.
机译:12月13日,JSW美国预计在俄亥俄州的Acero Junction在大约9年的关机之后开展钢铁融资的试验。 生产者可以通过本地来源学到的金属专家来完成2018年底的设备重新调试。 Acero Junction采用220万TPY EAF,LF,2股二板块CCM(280万吨)和300万吨热带轧机80“。 对钢铁熔融商店的投资以及轧机现代化的投资估计为2.5亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号