首页> 外文期刊>Highway Engineering in Australia: Transport Infrastructure·Traffic Management·Intelligent Transport Systems >ELEVATED CONSOLIDATION: STATE-OF-THE-ART VIBRATION EQUIPMENT DELIVERS OUTSTANDING RESULTS FOR ELEVATED RAIL LINE PRECAST SEGMENTS
【24h】

ELEVATED CONSOLIDATION: STATE-OF-THE-ART VIBRATION EQUIPMENT DELIVERS OUTSTANDING RESULTS FOR ELEVATED RAIL LINE PRECAST SEGMENTS

机译:升高的合并:最先进的振动设备为升高的轨道预制段提供出色的结果

获取原文
获取原文并翻译 | 示例
           

摘要

When it comes to producing quality finished concrete, ensuring the correct level of concrete consolidation is achieved during pouring is paramount. Whether it's precast or poured in situ, eliminating voids - particularly around reinforcing steel - helps to ensure that the finished concrete will perform as intended in both the long-and short-term.
机译:当涉及生产质量结束的混凝土时,确保在浇注过程中实现了正确的混凝土固结水平。 无论是预制还是原位浇注,消除空隙 - 特别是加强钢 - 有助于确保成品混凝土在长期和短期内按预期执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号