首页> 外文期刊>H&V News >Drastic rethink on building cooling needed to meet net-zero targets
【24h】

Drastic rethink on building cooling needed to meet net-zero targets

机译:在满足净零目标所需的建筑冷却时,急剧重新思考

获取原文
获取原文并翻译 | 示例
           

摘要

Cooling provision in offices and workplaces will need to be drastically rethought to include passive design measures and more integrated HVACR systems in order to achieve the UK's net zero targets. That is the conclusion of a feasibility study from the UK Green Building Council, examining how an office building and residential block respectively would need to be redesigned to meet the country's 2025 and 2030 emissions targets using currently available materials and technologies. The Building The Case For Net Zero report considered the base design of both structures to current standards and looked at how each could be built to meet predicted 2025 and 2030 UK performance targets.
机译:在办公室和工作场所的冷却条款需要急剧酝酿,包括被动设计措施和更多集成的HVACR系统,以实现英国的净零目标。 这是英国绿色建筑委员会的可行性研究的结论,审查了办公楼和住宅区如何分别需要重新设计,以满足国家的2025年和2030年使用目前可用的材料和技术的排放目标。 净零报告的建筑物案例将两个结构的基本设计视为当前标准,并研究了如何构建以满足预测的2025和2030英国性能目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号