...
首页> 外文期刊>Ti02 Worldwide Update >AUSTRALIA: TNG Revises Scale of Darwin TiO2 Pigment Project to 100,000 t.p.a.
【24h】

AUSTRALIA: TNG Revises Scale of Darwin TiO2 Pigment Project to 100,000 t.p.a.

机译:澳大利亚:TNG将达尔文TiO2颜料项目的规模估计为100,000吨.A。

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

TNG Ltd. (headquartered in Subiaco, near Perth) is making good progress on its vertically integrated project to mine the Mount Peake vanadium/titanium/iron deposit, process the ore to recover a high-grade TiO2 feedstock and produce finished TiO2 pigment products, employing a specially modified version of conventional sulfate-route technology. The deposit at Mount Peake is located 235 km north of Alice Springs and 1100 km south of Darwin (the provincial capital and main port in Northern Territory). The processing facilities will be located within the Middle Arm Industrial Precinct in the Darwin Harbour area and the finished products will be shipped out via the port of Darwin.
机译:TNG Ltd.(近珀斯总部位于珀斯)正在实现垂直整合项目的良好进展,以挖掘矿山钒/钛/铁矿床,加工矿石回收高档TiO2原料并生产成品TiO2颜料产品, 采用特殊修改的传统硫酸盐路线技术。 Mount Peacke的押金位于Alice Springs北部235公里,位于达尔文南部1100公里处(省级资本和北区主要港口)。 加工设施将位于达尔文港区的中臂工业区,成品将通过达尔文港供货。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号