首页> 外文期刊>The Inspectioneering Journal >SPENDING YOUR TURNAROUND BUDGET CONTINGENCY: IS IT INEVITABLE
【24h】

SPENDING YOUR TURNAROUND BUDGET CONTINGENCY: IS IT INEVITABLE

机译:花了你的周转预算应急:它是不可避免的

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Turnaround (TAR) budgets contain a contingency allowance to cover cost overruns resulting from discovery work and unanticipated events. Contingency is applied to ensure that the amount of money budgeted for the turnaround is not exceeded and there is no request for more. Across turnaround organizations, there are a variety of methods used to determine the amount of contingency for the turnaround budget. Many rely on historical plant data to show when the budget was overrun by a certain amount and then that amount is added to the budget. Some sites take a systematic approach of assigning a percentage of the historical past contingency based on the defined turnaround size and other parameters.
机译:周转(TAR)预算包含应急津贴,以涵盖发现工作和意外事件产生的成本超支。 拟议意见是为了确保未超过转染额预算的金额,并且没有要求更多。 在周转组织中,有多种方法用于确定周转预算的应急数量。 许多人依靠历史植物数据来显示预算超过一定数量的预算,然后将该金额加入预算中。 某些网站采用系统的方法,可以基于定义的周转尺寸和其他参数分配历史过去的偶然活动百分比。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号