首页> 外文期刊>Protein and peptide letters >Investigating the significance of risks in BOT transportation projects in Vietnam
【24h】

Investigating the significance of risks in BOT transportation projects in Vietnam

机译:调查风险在越南机器人运输项目中的重要性

获取原文
获取原文并翻译 | 示例
       

摘要

Purpose The Built Operate Transfer (BOT) model has been increasingly used in transportation investments in Vietnam. However, there is still an inadequacy of risk management applications in these projects and lack of research in this area. The study aims to improve the success of projects implemented through the BOT model in Vietnam. Design/methodology/approach The study followed a sequential design including interviews and a questionnaire survey to investigate the perception of stakeholders from public and private sector regarding the probability of occurrence and the severity of impact of risks in BOT transportation projects in Vietnam. Quantitative data from the survey was subjected to descriptive and inferential statistics to explore the priority of risks as well as the differences in the perception between the public and private sectors. Findings The results showed that the top five most significant risks in BOT transportation projects in Vietnam are: (1) problems with land acquisition and compensation, (2) inappropriate location of toll booths, (3) public resistance to pay, (4) high toll rate and (5) lack of cash flow. With the exception of "lack of cash flow," there were no statistically significant differences in the rankings of individual risks between the public and private sector. In addition, there is a significant positive correlation in the overall rankings of all risks for both sectors. Originality/value This study contributes to the body of knowledge by exploring the probability of occurrence and the severity of the impact of risks in BOT transportation projects in a developing country like Vietnam which has not been extensively explored yet. Second, it provides an insight into the perception of stakeholders from the public and private sector regarding the level of risks which is very useful for potential stakeholders in making decisions when they intend to participate in such partnerships. Third, it enables the Vietnamese government to establish suitable policies related to such projects. These contributions are very important in improving risk management in PPPs in developing countries.
机译:目的,建造的经营转移(BOT)模型越来越多地用于越南的运输投资。然而,这些项目中的风险管理应用仍然存在不足,并且在这方面缺乏研究。该研究旨在提高通过越南机器人模型实施的项目的成功。设计/方法/方法该研究遵循一项顺序设计,包括访谈和调查问卷调查,以调查利益攸关方对公共和私营部门的看法,了解越南机器人运输项目的发生概率和风险影响的严重程度。调查的定量数据受到描述性和推理统计数据,探讨风险的优先事项以及公共和私营部门之间感知的差异。结果表明,越南机器人运输项目中最重要的五大风险是:(1)土地收购和赔偿问题,(2)收费摊位的不恰当地点,(3)公共抵制薪酬,(4)高(5)缺乏现金流量。除了“缺乏现金流”之外,公共和私营部门之间的个人风险排名没有统计学上的差异。此外,两个部门的所有风险的整体排名都存在显着的正相关。原创性/价值本研究通过探索越南等发展中国家的机器人运输项目的发生概率和风险影响的严重程度,促进了知识体系,尚未广泛探讨。其次,它对公共和私营部门的利益攸关方的看法有所了解,这对潜在利益攸关方对潜在利益攸关方非常有用的风险的看法,这是在他们打算参加此类伙伴关系时做出决定。第三,它使越南政府能够建立与此类项目有关的合适政策。这些贡献对于改善发展中国家PPP的风险管理非常重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号