首页> 外文期刊>Corrosion Prevention & Control >Rehabilitating the coating and CP systems of in-plant parallel pipelines
【24h】

Rehabilitating the coating and CP systems of in-plant parallel pipelines

机译:修复工厂内并行管道的涂层和CP系统

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

THE UNDERGROUND structures in a gas-processing complex were provided with impressed-current cathodic protection (ICCP) for protection against external corrosion. The lines were externally coated with coal tar enamel. The installation of ICCP was executed in two phases, in 1993 and 1998. On the basis of on' pipe-to-soil potential (PSP) measurement, it was observed that all the underground pipelines in the slug catcher area were not getting adequate cathodic protection. The available data was analysed, and a survey was also carried out in that area. On the basis of these studies, it was found that certain areas were under-protected. An additional current provided to an anode bed could raise the negative PSP of the lines; however, 'on' PSP still could not be attained to the level more negative than -0.85V for all the lines. Therefore, it was planned to carry out close-interval potential logging (CPL), direct-current voltage gradient (DCVG), and current attenuation test (CAT) surveys to find out the condition of the coating, interference, and current drainage, etc. Due to close proximity of the lines and the other infrastructure of the plant, there was a possibility of interference. The condition of the lines and coating was assessed by excavation of the area; seven locations along the route of the lines were excavated, and it was observed that the coating condition of some of the lines was poor. Thermit welding of one of the lines to a cathode junction box (CJB) was broken, and some of the lines were shorted. Therefore, it has been recommend to recoat those lines which had poor coating, provide proper connection of the lines to the CJB and test points, and provide insulation between the lines which are shorted. For rehabilitation purpose, it has been recommended that a cold-applied, three-ply/two-ply, PE-backed tape system should be used. For the coating purpose, the pipe surface was prepared by sand blasting using a wet nozzle. A three-ply inner wrap and a two-ply outer wrap system, along with a compatible primer, were applied with a total thickness of 3.0mm. After rehabilitation, the PSP values of the lines were even more negative than -1.5V as compared to -0.6 to -0.8 before rehabilitation.
机译:气体处理厂中的地下结构设有外加电流阴极保护(ICCP),可防止外部腐蚀。管线外部涂有煤焦油瓷漆。 ICCP的安装分两个阶段进行,分别在1993年和1998年。根据对管道到土壤的电势(PSP)测量,观察到弹头收集区中的所有地下管道都没有得到足够的阴极保护。分析了可用数据,并在该区域进行了调查。在这些研究的基础上,发现某些区域的保护不足。提供给阳极床的额外电流可能会增加线路的负PSP。但是,对于所有线路,仍不能将“接通” PSP的电压降至负于-0.85V的水平。因此,计划进行近间隔电势测井(CPL),直流电压梯度(DCVG)和电流衰减测试(CAT)调查,以找出涂层的状况,干扰和电流消耗等。 。由于生产线和工厂的其他基础设施距离很近,因此有可能受到干扰。管线和涂层的状况通过开挖面积进行评估;挖掘了沿线路路线的七个位置,发现某些线路的涂层条件较差。一条线与阴极接线盒(CJB)的热熔焊接中断,部分线短路。因此,建议重新涂覆那些涂层较差的线路,提供线路到CJB和测试点的正确连接,并在短路的线路之间提供绝缘。出于恢复目的,建议使用冷敷,三层/两层,PE支撑的胶带系统。为了涂覆,通过使用湿喷嘴喷砂来制备管表面。施加三层内包裹层和两层外包裹层系统以及兼容的底漆,总厚度为3.0mm。康复后,该线的PSP值甚至比-1.5V负,而康复前为-0.6至-0.8。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号