USING MONTE-CARLO SIMULATION TO MEASURE THE BUSINESS-RELEVANT IMPACT OF PLANNING UNCERTAINTY ON FIELD SERVICE DELIVERY

机译:使用Monte-Carlo模拟来衡量规划不确定性对现场服务交付的业务相关影响

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Today, delivery of industrial maintenance services is planned under uncertainty, as, for example, the true task duration is unknown. Thus, providers rely on estimates at the stage of planning. During operations, the true task duration becomes known which results in a schedule update. This work evaluates the effects of information uncertainty on business-relevant performance indicators in industrial maintenance. We present a simulation model to reflect the evolution of information and the schedule revision during operations. Within a simulation experiment, we measure the business-relevant impact of different uncertainty levels on operations. Indeed, the findings of our research confirm the common understanding that reduced uncertainty at the stage of planning has a positive effect on service delivery. However, our research also shows that in order to achieve business-relevant impact in service delivery quality, the reduction of uncertainty at the stage of planning needs to reach a certain threshold.
机译:如今,工业维护服务的交付计划在不确定性下,例如,真正的任务持续时间未知。因此,提供商依赖于规划阶段的估计。在操作期间,已知真正的任务持续时间,这导致计划更新。这项工作评估了信息不确定性对工业维护中业务相关绩效指标的影响。我们提出了一种模拟模型,以反映业务期间信息的演变和日程修订。在仿真实验中,我们衡量不同不确定性水平对运营的业务相关影响。实际上,我们的研究结果证实了普遍的理解,规划阶段的不确定性降低了对服务交付的积极影响。然而,我们的研究还表明,为了实现服务提供质量的业务相关的影响,规划阶段的不确定性降低需要达到一定的门槛。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号