...
首页> 外文期刊>Proceedings of the Institution of Mechanical Engineers, Part B. Journal of engineering manufacture >An integrated supply chain model for deteriorating items considering delay in payments, imperfect quality and inspection errors under inflationary conditions
【24h】

An integrated supply chain model for deteriorating items considering delay in payments, imperfect quality and inspection errors under inflationary conditions

机译:考虑延迟支付,不完全质量和检测误差下的项目的综合供应链模型在通胀条件下

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In this article, an integrated production-distribution model is presented for a manufacturer and retailer supply chain under inflationary conditions, permissible delay in payments, deterioration, imperfect production process and inspection errors. We assume that the first-stage inspection of the manufacturer is not perfect and makes inspection errors of Type 1 and Type 2. The second-stage inspection of the manufacturer is at the end of production period without inspection errors. Also, the demand is linear function of time. Once the retailer receives the lot, a 100% screening process of the lot is conducted without inspection errors, and the screening process and demand proceed simultaneously. The main objective is to determine the optimal inspection time and the optimal number of cycle such that the present value of the total cost is minimized. Finally, a numerical example and sensitivity analyses are provided to illustrate the proposed model using a proper algorithm.
机译:在本文中,在通货膨胀条件下为制造商和零售商供应链提供综合生产分配模型,允许延迟付款,恶化,不完美的生产过程和检查错误。 我们假设制造商的第一阶段检查并不完美,并使1型和类型2.制造商的第二阶段检查在生产期结束时没有检查错误。 此外,需求是时间的线性函数。 一旦零售商接收到批次,就会在没有检查错误的情况下进行100%的筛选过程,并且筛选过程和需求同时进行。 主要目的是确定最佳检查时间和最佳循环次数,使得总成本的本值最小化。 最后,提供了数值示例和灵敏度分析以说明使用适当的算法来说明所提出的模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号