首页> 外文期刊>Power: The Magazine of Power Generation and Plant Energy Systems >Voith Completes Modernization of Scottish Hydro Station
【24h】

Voith Completes Modernization of Scottish Hydro Station

机译:福伊特完成了苏格兰水电站的现代化

获取原文
获取原文并翻译 | 示例
           

摘要

Voith in December announced it has completed the modernization of the Mucomir hydropower station in Scotland, and the 20-MW facility is again producing electricity for the Scottish grid. Voith was responsible for the new build, installation, and commissioning of the turbine unit. The company also installed a control system, circuit breaker, and hydraulic unit, and refurbished the generator.
机译:福伊特在12月宣布,它已经完成了苏格兰粘液水电站的现代化,而20-MW设施再次为苏格兰网格生产电力。 福伊特负责涡轮机组的新建,安装和调试。 该公司还安装了一个控制系统,断路器和液压装置,并翻新发电机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号