首页> 外文期刊>Planning Theory & Practice >The 'whys and wherefores' of citizen participation in the landscapes of HS2
【24h】

The 'whys and wherefores' of citizen participation in the landscapes of HS2

机译:公民参与HS2景观的“Whys和Wherefor”

获取原文
获取原文并翻译 | 示例
           

摘要

High Speed 2 (HS2) is the UK's proposed rail network which will run trains at speeds of up to 400 km per hour. The line will operate from Manchester and Leeds, via Birmingham to London, with eight new stations serving the planned 565 km of track. The impact on the landscape will be significant, as the width of the structure will be comparable to that of a three-lane motorway in many places. Construction will begin in 2017 and the first trains between London and Birmingham are scheduled to run in 2026 (HS2 Ltd, 2016a). Similar projects have caused degrees of controversy around the world, as in the case of Italy's 'No TAV' movement, which claims several individual demonstrations of up to 80,000 people since the early 1990s (infoaut.org, 2013). Despite support for HS2 from all the UK's major political parties, there is significant public opposition to the project, particularly along the proposed route. HS2 developed from plans for trans-European high-speed rail networks that were formalised in 1996. The first report to the government proposing HS2 was produced in 2009 by the consultancy firm Atkins (2009). It forecast huge increases in rail freight and passengers, alongside increasing road congestion and use of domestic flights. At the time, the Labour Government was facing a general election and, in the words of Lord Mandelson in July 2013, was "keen to paint an upbeat view of the future" by proposing HS2 (The Independent Newspaper, 2013). Government reviews of the idea ran from January 2009 to January 2012, with attention largely focussed on the route, the first 'preferred scheme' being announced in December 2009.
机译:高速2(HS2)是英国建议的铁路网络,该网络将以每小时最高400公里的速度运行火车。这条线将通过伯明翰到伦敦的曼彻斯特和利兹运营,其中八个新电台服务于计划的565公里。由于结构的宽度与许多地方的三车道高速公路的宽度相当,对景观的影响将是显着的。建设将于2017年开始,伦敦和伯明翰之间的第一列火车定于2026年(HS2 Ltd,2016A)。类似的项目造成了世界各地的争议程度,就像意大利的“没有TAV”运动一样,自20世纪90年代初以来,这是多达80,000人的个人示范(Infoaut.org,2013)。尽管支持所有英国的主要政党HS2,但仍有重要的公众对该项目的反对,特别是沿着拟议的路线。 HS2从1996年正式化的跨欧洲高速铁路网络开发的HS2。向政府提出HS2的第一份报告于2009年由咨询公司Atkins(2009)制作。它预测铁路运费和乘客的巨大增加,以及增加道路拥堵和国内航班的使用。当时,劳动政府面临着大选,用曼德尔勋爵在2013年7月的话语中,通过提出HS2(2013年独立报纸),“热衷于涂上未来的乐观观”。政府审查的想法从2009年1月到2012年1月,主要关注于该路线,第一次“首选计划”于2009年12月宣布。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号