首页> 外文期刊>Physics of particles and nuclei >Status and recent results of the BAIKAL-GVD project
【24h】

Status and recent results of the BAIKAL-GVD project

机译:BAIKAL-GVD项目的状态和最近结果

获取原文
获取原文并翻译 | 示例
       

摘要

The Prototyping phase of the BAIKAL-GVD project has been started in April 2011 with the deployment of first autonomous engineering array which comprises all basic elements and systems of the Gigaton Volume Detector (GVD) in Lake Baikal. The prototyping phase will be concluded with deployment of the GVD demonstration cluster "DUBNA" in 2015, which will comprise 192 light sensors arranged at 8 strings. The first stage of the GVD demonstration cluster which consists of three strings was deployed in April 2013 and successfully operated up to February 2014. We review the prototyping phase of the BAIKAL-GVD project and describe the configuration and design of the 2013 engineering array.
机译:BAIKAL-GVD项目的原型阶段于2011年4月开始,部署了第一自主工程阵列,该阵列包括贝加尔湖湖泊的所有基本元素和系统的所有基本元素和系统。 将在2015年的GVD演示集群“Dubna”的部署结束原型阶段,该阶段将包括在8个字符串上布置的192个光传感器。 GVD演示集群的第一阶段由三个字符串组成于2013年4月,并于2014年2月成功运营。我们审查了Baikal-GVD项目的原型阶段,并描述了2013工程阵列的配置和设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号