首页> 外文期刊>Steel & Metallurgy >Tata Steel restarts blast furnace revamped by Primetals Technologies at Port Talbot in Wales
【24h】

Tata Steel restarts blast furnace revamped by Primetals Technologies at Port Talbot in Wales

机译:Tata Steel重启由Portalals Talbot在威尔士港的Primetals Technologies改造的高炉

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In late January, a blast furnace revamped by Primetals Technologies was relit at Tata Steel Europe's steelworks in Port Talbot in South Wales, United Kingdom. The aim of this major investment project was to extend the useful life of Blast Furnace 5 and thus strengthen the position of Britain's biggest steelworks. Primetals Technologies won the contract to execute the work and was responsible for engineering, planning, equipment and material supply, demolition and erection - all to be executed during an ambitious shutdown stoppage in late 2018.
机译:1月底,由Primetals Technologies改造的高炉在南威尔士州南威尔士州塔塔钢铁欧洲钢厂依赖于英国。 这项重大投资项目的目的是扩大高炉5的使用寿命,从而加强英国最大的钢结构的地位。 Primetals Technologies赢得了执行该工作的合同,负责工程,规划,设备和材料供应,拆迁和勃起 - 所有人都在2018年底在雄心勃勃的关机停机期间执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号