首页> 外文期刊>Steel & Composite Structures: An International Journal >Mechanically fastened shear connectors in prefabricated concrete slabs - experimental analysis
【24h】

Mechanically fastened shear connectors in prefabricated concrete slabs - experimental analysis

机译:预制混凝土板中机械紧固剪切连接器 - 实验分析

获取原文
获取原文并翻译 | 示例
           

摘要

Nowadays, in prefabricated composite construction, composite action between steel beam and concrete slab is often achieved with positioning of shear connectors in envisaged openings of concrete slabs. Prefabricated concrete slabs are used for composite steel-concrete buildings and bridges, both for the construction of new structures and for renovation of existing ones, significantly reducing construction time. Development of different types of shear connectors represent alternative solution to the traditionally used headed studs, considering their shear resistance, stiffness and ductility. New types of shear connectors tend to reduce the construction time and overall construction cost. Mechanically fastened shear connectors represent a viable alternative to headed studs, considering their fast installation process and shear resistance. X-HVB shear connectors are attached to the steel beam with two cartridge fired pins. The first step towards extensive implementation of X-HVB shear connectors in composite construction is to understand their behaviour through experimental investigation. Results of the push-out tests, in accordance to Eurocode 4, with X-HVB 110 shear connectors positioned in envisaged openings of prefabricated concrete slabs are presented in this paper. The experimental investigation comprised three different specimen's layout. Group arrangement of X-HVB shear connectors in envisaged openings included specimens with minimal recommended distances and specimens with reduced distances between connectors in both directions. Influence of different installation procedures on overall behaviour of the connection is presented, as well as the orientation of shear connectors relative to the shear force direction. Influence of variations is characterized in terms of failure mechanisms, shear resistance and ductility.
机译:如今,在预制的复合结构中,钢梁和混凝土板之间的复合动作通常通过定位混凝土板的设想开口中的剪切连接器定位。预制混凝土板用于复合钢混凝土建筑物和桥梁,用于建造新结构和现有的改造,显着降低施工时间。考虑到它们的剪切电阻,刚度和延展性,不同类型的剪切连接器的开发代表传统使用的头螺柱的替代解决方案。新型剪切连接器倾向于降低施工时间和整体施工成本。机械紧固的剪切连接器代表着头螺柱的可行替代品,考虑到它们的快速安装过程和剪切电阻。 X-HVB剪切连接器连接到带有两个盒式筒销的钢梁。迈向复合结构中X-HVB剪切连接器的广泛实施的第一步是通过实验调查来了解其行为。根据EUROCODE 4,推出试验的结果采用X-HVB 110剪切连接器,其中X-HVB 110剪切连接器定位在预制混凝土板的设想开口中。实验研究包括三种不同的标本布局。设想的开口中的X-HVB剪切连接器的组布置包括具有最小推荐距离和标本的标本,标本在两个方向上的连接器之间的距离下降。提出了不同安装程序对连接的整体行为的影响,以及相对于剪切力方向的剪切连接器的方向。变化的影响特征在于失效机制,剪切抗性和延展性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号